Select Interiors / News  / Projects for Q1 2018 & Listed Building Update

Projects for Q1 2018 & Listed Building Update

Select Interiors wins contract for the design and refurbishment of 11 rest facilities for Metrolink operators Keolis Amey for Transport for Greater Manchester

 

Select Interiors have recently tendered and won the first of a major investment in staff facilities owned by Transport for Greater Manchester and operated by Keolis Amey. Select Interiors Ltd completed design and refurbishment works for two rest facilities for previous operators of Metrolink in Piccadilly & Cornbrook Stations in Manchester. Select Interiors Ltd have won another contract to design and refurbish a Rest Facility at Deansgate Station and provide design, space planning through to the completion of all the building works. Services include demolition, an extension, partitioning, bespoke joinery, kitchen facilities, electrical, distribution, data, A/V equipment, desks, chairs & graphics

Visual of proposed works at Piccadilly

Extension & re-design staff facility at Piccadilly Station for Metrolink by Select Interiors Ltd

Visual of proposed works at Cornbrook Station

Progress images for refurbishment of staff rest facility at Cornbrook in Stretford

Progress extension & re-design staff facility RPTDev Metrolink Cornbrook

 

Progress of a Design & Refurbishment of Grade II Listed Building within the Barton Arcade, 63 Deansgate, Manchester by Select Interiors Ltd for Apple Partner GBM Ltd.

The project brief was to design, conversion & refurbish of a Grade II listed (both external envelope and internal Listed) retail unit, the unit has three floors, a basement, ground with a single shop front on Deansgate and a double frontage to the 1st floor.

Survey images

GBM are a long-established Apple authorised reseller. This successful company has been trading for over 20 years and is an Apple accredited Solutions, Service and Training centre. They work with small businesses, multi-nationals, schools and professional creatives specialising in Apple technology. The brief to design and fit out a retail shop, workshop, showroom, meeting and training facility to complement their existing 3,500 sqft space in Ancoats.

Section drawings, notes & 3 D model for conversion of the ground floor to retail with bespoke display, counters and service desk.

Draft 3D render of proposed fit out to include updated branding & graphics.

Mood board GBM

Select Interiors worked closely with branding and digital agency Jam Creative to re-brand to completely update their current graphic / branding design and to compliment their move to a prestigious retail site.

Please see progress images taken over 10 weeks from demolition, construction, 1st fix mechanical and electrical services and fit out

 

Week 1 demolition

 

Week 2 demolition

 

Week 3 damp treatments & 1st fix electrical & mechanical services and fit out

 

Week 4 2nd Fix mechanical services, 1st fix electrical and fit out

 

Week 5 fit out, decoration, 1st fix electrical and joinery

 

Week 6 fit out, plastering, 1st fix electrical and sprinklers

 

Week 7 fit out, 2nd fix electrical to basement and mist coat decoration 1st floor

 

Week 8 2nd Fix mechanical services, 2nd fix electrical and fit out.

 

Week 9 fit out, decoration,2n fix electrical and joinery inc feature wall

Please click the link for walk round of proposed project created in Revit by Select Interiors to illustrate the scheme http://pano.autodesk.com/pano.html?url=jpgs/0a13fd0c-1fbd-447a-a7e9-1394e443c9b6

 

See above a video of the team at work on a design & fit out in the Northern Quarter for digital media and PR company Intelligent Conversation

 

Please click the link for further images of Select Interiors projects https://selectinteriors.pixieset.com/

 

The team at Select Interiors would like to thank all the clients above for their valued enquiries and business call 0161 445 40404 for enquiries or email to moc.sroiretni-tcelesnull@ofni