The Iron Chicken & Major Clanger seeing what Select Interiors is up to at the former museum store at The Pelican Centre from space…the power of social media!
Select Interiors commercial interior designers & shop-fitters Manchester are converting the former dilapidated Museum Store adjacent to The Pelican Centre in Tyldsley. The project and works will transform the redundant building into a dynamic new Gym & leisure facility. Architect Gary Seed, principal contractor CBES, site management & fit out by Select Interiors Ltd
Image of Major Clanger keeping an eye on progress at The Pelican Centre after hearing about the joint project between Wigan Borough Council & CBES through the blogosphere.
The scope of work includes demolition, major excavation, structural steel, importing and compacting 45 tonnes of hard-core, steel mesh and concrete, timber treatments, cladding, mezzanine floor, BWIC, electrical, partitions, joinery, flooring and decoration.
Week 1 strip out of lath & plaster ceilings, excavate and remove 74 tonnes of concrete and hard-core
Week 2 excavation and piling up debris & spoil and removing to refuse skip. Installing treated batons on DMP to wall areas
Week 3 importing aggregate and grit sand blinding ready for installation of steel reinforcement mesh and 150mm of concrete
Week 4 Select Interiors team achieved a PB by supplying & laying 74 Tonnes of concrete in an afternoon
External remedial works & new rear elevation wall and fire exit
Week 7 internal boarding, plaster finishes, electrical, mechanical, joinery and decoration
Final stages prior to floorcoverings being installed
Major Clanger & The Iron Chicken calling Select Interiors Manchester Interior design & fit out company congratulating them on progress…and an enquiry for re-designing the interior of the small Blue planet’s interior!
Although flattered the Select Interior Design team have respectfully and politely declined the invitation, as it is extremely difficult to improve on perfection…
The scheme at The Pelican Centre is nearing completion and is to be opened by The Secretary of State & special guest Major Clanger (the Iron Chicken had a prior engagement but she sent her warm regards)
Special thanks and recognition to Nathalia Stothard and the rest of the Pelican Centre management team who’s vision and drive have enabled the scheme to come to fruition. The team’s ability to not only operate the Pelican Centre but to expand its remit and attract funding from diverse sources like The Sports Council of Great Britain & local government to provide much needed services for the local community
Note; the use of Major clanger is pure fiction & fun and is not meant to be read as a metaphor for trusting a quantity surveyor
The Packet House Burscough is in a sorry state, but not for much longer…Commercial fitout and design experts, Select Interiors ltd are on the way!
Short progress video, 1 week 1 day of the Select Team crack surgeons
Select Interiors Manchester restaurant & bar designers and fit out specialists have been started works on the interior design & refurbishment of The Old Packet House Bar & Restaurants for the expanding New Horizons Ltd owners of Allotment Bar in Manchester’s Northern Quarter.
Select Interiors Manchester interior design and bar fitters are converting the dilapidated premises in a canal side setting in Burscough. Works include full interior design & space planning, drawings for building control. Demolition, remedial works, kitchen, electrical, mechanical, bespoke joinery, flooring and decoration
Select Interiors plan layout & designs for The Old Packet House, Burscough
Drawing of Select Interiors interior elevations and finishes for The Old Packet House, Burscough
Select Interiors commercial interior space planners and designers work closley with Raptdev as part of their 8 year contract renewal
Select Interiors Directors Martha & Carl were invited to do a talk and presentation for Manchester Metrolink & operators RatpDev on office design for an extension on an 8 year programme of office & station refurbishments http://goo.gl/29QpmY. Select Interiors commercial interior space planners and designers have produced designs and costs as part of their 8 year contract renewal
3D Model for Manchester Metrolink RatpDev staff canteen
3D Model of canteen and rest are for Manchester Metrolink & RatpDev
Space planning to convert Trafford Depot head office to accommodate more staff and make better use of under-utilised space
Please click the link for further images of Select Interiors projects http://selectinteriors.pixieset.com/